E 18 Highway Brigde

Slowly grinding the time…

Drammen 1

In this sculpture temperature differences is used as the dynamic force in the construction. The force runs a stone wheel in something that could be described as a large lathe. Through many years, the wheel will be affected and will be honed down. Stipulated production time for the project is one hundred years. A certain width of the wheel is then “turned” away and the wheel can be taken down and replaced. The process can start all over again.

Drammen City, Norway